For buyers

PCB quotes: what each of the 23 types actually requires

23 quote types are listed below, in four groups. The package that decides the reply is almost always the same: a stack-up with the laminate named per layer, copper weight per layer, minimum hole and trace, surface finish, quantity and acceptance class. What changes between types is which of those numbers the factory cannot work without.

Lead times are industry ranges, not commitments. Every factory's actual date depends on its queue that week.

ChinaPCB.org does not quote boards and takes no commission. These pages exist so that the RFQ you send to a factory is complete the first time. Send it yourself — see how to send an RFQ.

Compare all 23 quote types

The middle column is the variable that moves the price most, not the only one. Use it to decide what to spell out explicitly in the enquiry, then open the type for its full parameter set.

Main cost driver and typical lead time by quote type. Click a type for what to send.
Quote type Main cost driver Typical lead time
Rigid PCB Quotes Panel utilisation, thickness tolerance and surface finish 3–7 working days for prototypes, 2–4 weeks for production
Rigid-Flex PCB Quotes Lamination cycles, coverlay and stiffener tooling 1–2 weeks for prototypes, 3–5 weeks for production
Flexible PCB Quotes Base film, layer count and panel yield 1–2 weeks for prototypes, 2–4 weeks for production
HDI PCB Quotes Sequential lamination cycles and laser via count 2–3 weeks for prototypes, 4–6 weeks for production
FR-4 PCB Quotes Laminate grade, thickness and copper weight 3–7 working days for prototypes, 2–4 weeks for production
High-Tg PCB Quotes Laminate class and whether the stack is uniform 1–2 weeks for prototypes, 3–4 weeks for production
Rogers PCB Quotes Laminate series, hybrid stack complexity and test method 2–4 weeks for prototypes, 4–6 weeks for production
Metal-Based PCB Quotes Base metal, dielectric thickness and punching tooling 1–2 weeks for prototypes, 2–4 weeks for production
6-Layer PCB Fabrication Quotes Registration capability and lamination cycle count 5–10 working days for prototypes, 2–4 weeks for production
Prototype PCB Fabrication Quotes Tooling amortisation over a very small quantity 24 hours to 7 working days, depending on layer count and finish
PCB Assembly Quotes Placement count, unique part count and test coverage 3–7 working days for prototypes, 2–4 weeks for production
Turn-Key Assembly Quotes Component sourcing, not labour 2–4 weeks for prototypes, 4–8 weeks for production
SMT Assembly Quotes Fine-pitch and BGA content, not total placements 3–5 working days for prototypes, 1–3 weeks for production
Box-Build Quotes Enclosure content, harness work and test labour 3–6 weeks, driven by enclosure lead time
Prototype PCB Assembly Quotes Setup time relative to the quantity 2–5 working days, faster if parts are consigned
PCB Design Quotes Layer count, constraints and the number of review cycles 1–4 weeks, depending on complexity and how frozen the requirements are
Reverse Engineering Quotes Board complexity and how much must be re-derived 1–3 weeks for a simple board, longer for dense or multilayer work
PCB Stencil Quotes Frame type, cut quality and area ratio of the smallest aperture 1–2 working days
PCB Repair and Rework Quotes Access, package type and the rework method required 1–5 working days, depending on the operation
PCB Drilling Quotes Hole count, aspect ratio and the drilling method 1–3 working days
PCB Cutting and Depaneling Quotes Method (V-score, route, laser, punch) and the tooling 1–3 working days, plus tooling lead time for punching
PCB Testing Quotes Fixture cost, net count and coverage level 1–5 working days, plus fixture build time
Conformal Coating Quotes Masking labour and the chemistry chosen 2–5 working days
Other quotes Application specific; no standard process Case by case

Bare board fabrication quotes

Fabrication is priced per panel and converted to a per-board price. All ten types below share a core package, but each one has a parameter that decides whether the quote is cheap or simply for a different board.

Assembly and turnkey quotes

Assembly quoting starts from the BOM, not from the Gerber. Where the components come from, who carries the shortage risk, and how the board is tested decide most of the difference between two assembly quotes.

Engineering, tooling and rework quotes

These are priced as time and tooling rather than as production. The scope statement matters more than the number, because the scope is what the number is bounded by.

Drilling, cutting, test and coating quotes

Single-operation services, usually bought against boards that already exist. The price is setup plus machine time, so the quantity break is steeper than on fabrication and the cost of getting the operation wrong is higher.

Other quotes not listed above

Castellated modules, heavy copper above 4 oz, metal-backed LED arrays, embedded components, cavity boards and rigid-flex with pressed connectors all fall outside the standard categories. They are quoted case by case, and the useful thing to send is the application rather than a category name. If a supplier cannot tell you which process will be used, the price will not hold.

Material-driven quotes

FR-4, high Tg and Rogers are covered as their own quote types because they change the process window. Where the material alone changes the price without changing the process — a different solder mask colour, a different legend ink — the difference is usually in lead time rather than unit cost, and it is not worth a separate enquiry.

How to make two quotes comparable

Three quotes on the same board are only comparable when four things are held constant. Most of the price spread buyers see comes from a difference in one of these, not from a difference in factory efficiency.

  • Acceptance class. IPC-6012 Class 2 and Class 3 are different products with different inspection and different yield.
  • Who supplies the material. A quote where the factory buys the laminate carries a different risk than one where you consign it.
  • Test coverage. Bare-board electrical test, AOI, X-ray and functional test are separate line items. A quote that omits them is not cheaper, it is narrower.
  • Incoterm and payment terms. Ex-works against DDP changes the landed cost by more than most negotiations on unit price.

Every quote above assumes one thing

It assumes the factory you sent it to can actually make the part. A price from a plant whose process window does not reach your design is not a cheap price, it is a price for a different board — and the difference usually surfaces at first article, after tooling has been paid. That is the reason this directory records capability per factory rather than listing names: what we check is the set of numbers that decide whether a quote can be honoured.

Fee structure and editorial independence are described on the about page. What we can and cannot confirm about a factory is on how we verify.