Assembly is priced on placements and on the number of unique part numbers, because each unique part adds a feeder setup and a reel change. A board with 400 placements across 60 unique parts costs more to set up than one with 800 placements across 20.
Lead times are industry ranges, not commitments. Any factory's actual date depends on its queue that week, and on what else is already scheduled.
ChinaPCB.org does not quote boards and takes no commission. This page exists so that the enquiry you send to a factory is complete the first time. Send it yourself — see how to send an RFQ.
What this quote is priced on
Five to seven variables move the number on a pcb assembly quote. They are not equally important, and only the first two are usually discussed.
- Placement count. The unit price scales with placements per board, but not linearly: the first few hundred carry the line setup, and the marginal cost per placement falls after that.
- Unique part count. Every unique part is a feeder position, a reel change and a verification step. Sixty line items on one board can cost more in setup than twice the placements across twenty.
- Sides assembled. A second side means a second pass, a second stencil, and either a selective glue process or a double-reflow with careful weight distribution.
- Test coverage. AOI, X-ray, functional test and ICT are separate line items with separate fixtures. A quote that omits them is narrower, not cheaper.
- Component ownership. Labour-only and turnkey are different businesses. A labour-only quote leaves procurement, shortages and counterfeit risk on your side.
- Volume and changeovers. The price per board depends on run length because setup is amortised. Ten boards and ten thousand boards are not the same process.
The parameters a factory needs
This is the set that has to be in the enquiry before a pcb assembly price means anything. The third column is why each one changes the answer, which is also the reason a quote that skips it is not really a quote.
| Parameter | What to state | Why it changes the answer |
|---|---|---|
| BOM with manufacturer part numbers | Full MPN, package, tolerance and acceptable alternates per line | Without MPNs the factory cannot check availability, and substitutes are chosen for you. Alternates written down front avoid a late change. |
| Placement count and unique lines | Placements per board and the number of distinct BOM lines | These two numbers, not board size, are the pricing unit. One without the other cannot be priced. |
| Centroid file | Pick-and-place data with rotation, side and reference designator | The program is generated from it. A centroid exported with the wrong origin rotates every part on the board. |
| Sides assembled | Top only, bottom only, or both, and the part mix per side | A second side is a second pass, a second stencil and a different reflow sequence. |
| Panelisation | Whether boards arrive panelised, and the array if you own it | Line handling is defined by the panel. Loose boards on a production line need a carrier, which is a cost and a yield risk. |
| Test requirement | AOI only, AOI plus functional, or full ICT with the fixture owner | Test is where two assembly quotes usually differ. Naming the level makes the two numbers comparable. |
| Component source | Consigned by you, bought by the factory, or mixed per line item | Decides who carries procurement risk and whether the price includes material at all. |
| Wash and coating | Aqueous or no-clean, and whether conformal coating follows | Cleaning constrains flux choice; coating constrains both flux and handling. Both change the process flow. |
Send with the enquiry
- BOM with MPNs and the alternates you will accept, line by line.
- Gerber plus the centroid file and the assembly drawing with polarity.
- Placements per board and the number of unique BOM lines.
- Whether components are consigned, bought, or mixed, and by whom.
- The test level you require, and who owns the fixture if ICT is included.
Where it goes wrong
- A quote that never asks who supplies parts. It is a labour-only quote. The component cost arrives later as a separate invoice, usually after the schedule has been promised to someone else.
- Centroid exported from the wrong origin. Every placement shifts by the offset. The line runs, the boards fail first-article, and the schedule is lost to a file error.
- Test omitted to compare prices. Two quotes where one includes functional test are not comparable. The cheaper one has simply moved the test to your bench.
- Loose boards sent to a production line. Without a panel or a carrier, the line cannot handle them. The factory either refuses or builds a fixture and charges for it.
Comparing two pcb assembly quotes
Two prices are only comparable when the parameters above are held constant. Most of the spread buyers see comes from a difference in one of these, not from a difference in factory efficiency.
- Compare the test scope before the price. AOI-only against AOI plus functional is a different product.
- Compare who buys the parts. Labour-only quotes should be compared against labour-only quotes, never against turnkey.
- Compare the panel and handling assumptions. A quote that assumes a carrier is not the same as one that assumes a panel.
- Ask both for the placement count they used. A supplier who counted differently has priced a different board.
What this page does not tell you
This page does not give a price per placement, because the rate depends on volume, part mix and line, and any single figure would be wrong for most readers. What is stable across factories is the structure of the cost, and that is what the parameter table describes.
Related
- SMT assembly: the process behind the placement count
- Turn-key quotes: when the factory buys the parts
- Prototype assembly: setup as most of the cost
- Testing quotes: what coverage actually costs
Fee structure and editorial independence are described on the about page. What we can and cannot confirm about a factory is on how we verify.