Small-quantity bare boards on a short lead time, usually five to fifty pieces. The quick-turn line and the volume line are often different plants with different processes.
Prototype PCB Fabrication: recorded factories
Ordered by evidence strength, then by most recent review. Each profile states what was checked, on what date, and which processes are subcontracted rather than performed on site. A listing is not a guarantee of factory ownership or certification validity.
Benchuan Intelligent Circuit (Nanjing)
Benchuan lists four production bases, but its Zhuhai plant was bought from DSBJ in 2024 for RMB 39.5m. The registry shows one address.
Dongguan Dingxin Circuit
Dingxin's milestone page ends at a 2018 Hunan plant, but filings show that plant was exited in 2023 and capital was cut in 2025.
Dongguan Viafull Circuit Technology
Viafull publishes UL file E466925, a checkable number, yet its own page quotes both 1-14 and 2-16 layers and 180 staff against 41 in filings.
Dongguan Yuejie Circuit Technology
Yuejie lists 64 layers, 10oz copper and IC substrates, yet its registry record shows three staff, four former names and a residential address.
Fastprint (Xingsen)
Fastprint is a brand over several legal entities. The prototype business, the substrate business and a cancelled expansion tell three different stories.
Heshan TTE Circuit
Heshan TTE's published capacity spans six figures, from an existing 130,000 m2/yr to an 800,000 m2/yr full-build target. Only one is a current licence.
Huaqiu PCB
Huaqiu states its layer ceiling three ways across its own properties. Its UL file also sets a conductor width that the marketing table never mentions.
JCD (Jingchengda)
Jingchengda's Chinese profile claims 2,000 staff and two plants; its English page says 860 staff and one plant, fewer people than Taishan employs.
JDB PCB
The entity named on jdbpcb.com was registered in October 2025. Its UL file, by contrast, is specific and checkable, and that contrast is the story here.
Jinhong Electronics (Ji'an)
Jinhong's own pages give three plant areas, three headcounts and four layer counts, and call the site both a quick-turn shop and a volume factory.
JLC (JLCPCB)
JLC quotes in 24 hours and publishes a complete table. Its UL file is held by another entity, and no page says which of five plants runs your order.
JOVEPCB (Zhongfu Circuit)
JOVEPCB describes three production bases in Chinese and five in English, and quotes 34 layers that turn out to be a prototype limit, not a production one.
King Brother (KINGBROTHER)
Kingbrother books 100,000 PCB part numbers a year, while an older page on the same site implies 120,000. Neither figure is in square metres.
Onpress PCB (Guangdong Anbai Circuit)
Onpress dates to 1987 in Hong Kong, 1992 as a relocation and 1993 as a PRC entity. Its published capacity uses four units that cannot be reconciled.
Putian Technology PCB (formerly GCI Jiesai)
Putian Technology is a CETC-controlled listed group whose PCB arm runs two named bases. Its 88-layer claim sits beside a 40-layer design limit.
Q&D Circuits (Qiangda)
Q&D Circuits runs 50-layer builds and 10,000 part numbers a month from Shenzhen, but its own pages disagree on whether it employs 1,200 people or 1,350.
Shanghai Jiajietong (Fast-PCB)
Jiajietong's Jiading address runs real etch lines - two plants plus a 2025 expansion - yet the same site prints four plant-area pairs and three age claims.
Shenzhen Lianshuo Precision Electronics
Lianshuo's site claims a 2002 founding and 2003 certifications, but its registry date is 2012 and its own certificate page lists only ISO9001.
Shenzhen Xinzhida Electronics
Xinzhida's site claims 1-40 layers and 30,000 m2 a month, but its registered entity has four staff and a wholesale-only business scope.
Stariver Circuit (Huangshi)
Three headcount figures for one plant, falling from 400 to 170, against an unchanged 120,000 m2 a month. Either the count is partial or the lines are quiet.
Xunjiexing (JXPCB)
Xunjiexing's site gives 2.8 million m2 a year, 2.6 million in an article, and 1.84 million when the four plants are added up one by one.
YCL (Inno Circuits)
Yingchuangli builds 2 to 48 layers in Suining and added IC and Mini-LED substrate lines in 2024. Its ChiNext application was withdrawn in 2022.
What this service covers
Prototype fabrication produces bare boards in small quantity, fast. Typical orders are five to fifty pieces, often on a 24-hour to five-day turnaround, and the price is dominated by engineering and setup rather than material.
The important structural fact is that prototype and volume production are usually different operations. Quick-turn factories exist because they specialise in it: they run many small jobs, keep standard laminates in stock and accept a different yield profile. A volume factory can do prototypes, but it does so as an exception to its normal flow.
What decides whether the prototype is representative
- The process, not just the design. If the prototype is made with a different surface finish, a different solder mask or a different plating thickness than production, the assembly result will not transfer.
- Surface finish. HASL is cheap and flat enough for through-hole work; ENIG and immersion silver are specified when planarity and shelf life matter. A prototype in HASL and production in ENIG is two different assemblies.
- Laminate batch and Tg. Standard FR-4 is not one material. A prototype made on a high-Tg laminate and a production order on standard FR-4 will behave differently in reflow.
- Panelisation. Prototype orders often ship as a single board with no rails or fiducials. Production needs both, and the assembly process changes accordingly.
- Test. Electrical test may be omitted at prototype quantity to save time. A board with an open net then arrives at assembly and is diagnosed as an assembly fault.
What drives the price
- Engineering and setup, which is a fixed charge per order and dominates at low quantity.
- Minimum order area. Most quick-turn suppliers price a minimum panel area regardless of board size, so small boards are charged as if they were larger.
- Layer count and surface finish, with ENIG and gold fingers adding cost per panel.
- Lead time, because expedited slots are sold at a premium.
- Panelisation, which is additional engineering work if the supplier does it.
What we check before listing a factory here
- The factory states whether prototype and volume production run on the same site and process, and if not, which parameters differ.
- Surface finish and laminate options are listed with their effect on lead time, rather than offered as an undifferentiated menu.
- Electrical test is either included or explicitly declined, and the reason is stated.
- Panelisation is offered as an engineering service, not only as a fabrication step.
- Minimum order quantity and minimum billing area are published, so the price is comparable across suppliers.
- The factory will state the layer count and finish above which the work moves to its volume line.
Where it goes wrong
- Prototype from a quick-turn house, production from a volume house. The design is qualified on a process that will never build it again.
- Surface finish changed between prototype and production. Assembly yield drops and the cause is two steps upstream.
- No electrical test at prototype. The open net is found at assembly and blamed on the assembly supplier.
- Panelisation added at production. The board outline was never checked against rails and fiducials, so it does not fit.
- Minimum area charges compared as unit price. A small board quoted at a minimum panel area can look expensive per unit and be the cheapest per order.
How it differs from neighbouring services
Prototype assembly places components on a prototype board; this page covers the bare board. Volume fabrication is the production version of the same process at a different scale, and the two should be compared on finish, laminate and test rather than on price alone.
What to send in an RFQ
Gerbers and drill file, layer count, board size and quantity, stack-up, surface finish, solder mask colour if it matters, panelisation requirement, and the date you need the boards. The prototype fabrication quote specification lists the fields that change the answer.
If the boards will be assembled, read prototype PCB assembly next, because the finish and the panelisation decide whether that step goes smoothly.