Each post takes one decision that a hardware team has to make before it places a production
order. The answer is written so that a single paragraph can be quoted on its own, and it
always says which part is a judgment rather than a published fact.
Five signals that a prototype should leave an online PCB platform: pooled-panel pricing, complex stackups, audit needs, mixed SMT, and direct CAM access.
ChinaPCB Editorialprototype · production · sourcing · verification
One MPN, one symbol, one footprint in the library. At the factory the part acquires a second identity, and no profile publishes the rules for the swap.
The SI/PI article describes simulation and eye diagrams in a plant. In 1,252 factory lines, impedance is the only electrical number, and no coupon is named.
Your repository controls the design; the purchase order controls the board. How a revision travels through CAM, tooling and test, and where it gets lost.
Browse by topic
Sixteen standing question boards sit beside the dated articles. Each one answers the
technical question; the factory lists and service pages answer who can do the work.