PCB Fabrication Explained
Bare-board process questions answered from the factory floor: lamination, drilling, plating, imaging and routing, and where a claim stops being verifiable.
Questions this topic answers
Short answers first. Each one is written to be quoted on its own, and each one says what has to be on record before the answer can be trusted.
- 01
Which steps should a factory be able to name on its own site?
Lamination, drilling, plating, imaging, etch, solder mask, surface finish and routing. Some shops send one step out, which is not automatically wrong, but the subcontracted step must be declared before the audit, not discovered during one.
- 02
What does a cross-section actually tell you?
It shows layer registration, dielectric thickness, plating in the barrel and voids around filled vias. It describes the coupon that was cut, so ask whether the coupon came from your panel or from a separate test board. Those are different levels of evidence.
- 03
Why do two factories quote different minimum trace widths?
Because their imaging, etch chemistry and copper thickness differ. A minimum quoted on one ounce outer copper may not hold on two ounces. Ask for the limit that applies to your stackup and copper weight rather than the headline capability on a website.
- 04
What is the most common cause of a late fabrication change?
A stackup that was never confirmed against the factory stock. The design assumes one prepreg set, the line has another, and the thickness or impedance shifts. Confirm the stackup and the material before tooling, and the change becomes a conversation rather than a delay.
Where this meets the directory
These pages answer the commercial question — who can do the work and what is on record. This topic answers the technical question behind it.
Articles filed here
-
Cloud PCB design security: five myths, and the handoff the platform answer stops at
Cloud PCB design security does not end at the platform boundary. Five vendor answers, then what 131 Chinese factory records show about the handoff.
-
PCB design review: the review the workspace cannot run
Design review in the CAD workspace and CAM review at the factory are different jobs. What 1,252 published capability lines say about the second one.
-
Multi-level BOM: the quantity that changes four times
A multi-level BOM rolls one quantity up a tree. Between the drawing and the shipment the same part carries four numbers, and three are set in a plant.
-
PDN resistance: the half of R that the fab decides
Seven CAD techniques lower PDN resistance. In 131 published factory records, not one names the finished copper thickness those techniques assume.
-
Hardware version control: the half that lives at the supplier
Your repository controls the design; the purchase order controls the board. How a revision travels through CAM, tooling and test, and where it gets lost.
-
When to switch from PCBWay or JLCPCB to a direct Chinese PCB factory
Five signals that a prototype should leave an online PCB platform: pooled-panel pricing, complex stackups, audit needs, mixed SMT, and direct CAM access.