Blog topic · 03 / 16

PCB Assembly Explained

Assembly questions are process questions: which steps happen under one roof, which are subcontracted, and what evidence follows a board from print to test.

Before comparing assembly quotes, write down the steps your board needs and ask which of them the named factory performs itself. Most price differences are scope, not efficiency.

Questions this topic answers

Short answers first. Each one is written to be quoted on its own, and each one says what has to be on record before the answer can be trusted.

  1. 01

    What should an assembly RFQ list so quotes are comparable?

    List component count, package types, placement side, through-hole work, coating, potting, test requirements and whether you supply the parts. Two quotes cannot be compared when one assumes consigned components and the other includes them.

  2. 02

    Why does the same board get different prices from two factories?

    Usually one supplier is quoting placement only while the other includes cleaning, inspection, rework and test. Ask each to name the process steps inside its price, then compare the lists rather than the totals. The lower number often covers less work.

  3. 03

    When does mixed SMT and through-hole work change the factory choice?

    When through-hole volume is high enough to need selective soldering or a separate wave line, the order leaves a standard SMT flow. Ask whether the factory runs both processes on the same site and what its hand-solder allowance is.

  4. 04

    What evidence should come back with a production lot?

    At minimum a profile or paste record, first-article approval, AOI or X-ray result where the board requires it, and a test report tied to your lot number. A photograph of finished boards is not a record and should not be accepted as one.

Where this meets the directory

These pages answer the commercial question — who can do the work and what is on record. This topic answers the technical question behind it.

Articles filed here

  1. Component library: the part number that does not survive the BOM

    One MPN, one symbol, one footprint in the library. At the factory the part acquires a second identity, and no profile publishes the rules for the swap.

  2. Multi-level BOM: the quantity that changes four times

    A multi-level BOM rolls one quantity up a tree. Between the drawing and the shipment the same part carries four numbers, and three are set in a plant.

  3. When to switch from PCBWay or JLCPCB to a direct Chinese PCB factory

    Five signals that a prototype should leave an online PCB platform: pooled-panel pricing, complex stackups, audit needs, mixed SMT, and direct CAM access.