IPC Standards Explained
Which IPC document answers which question, what Class 1, 2 and 3 change in practice, and why a standard named without a revision leaves nothing to audit.
Questions this topic answers
Short answers first. Each one is written to be quoted on its own, and each one says what has to be on record before the answer can be trusted.
- 01
Does an IPC number on a quotation prove the board meets it?
No. The number names the acceptance document. It does not say which site inspected your lot, which revision was used or whether the inspection record is available to you. Ask for those three things in writing before the order is placed.
- 02
What actually changes between IPC Class 1, 2 and 3?
The allowed defects and the inspection strictness change. Class 3 applies where a board failure is not acceptable, such as aerospace or life-support equipment. A factory may hold the capability for all three classes while your particular order is built and inspected to only one.
- 03
Which document should I name for a bare board and which for an assembly?
Bare-board construction and acceptance and assembled-board acceptance are covered by different documents. Naming the wrong one is a common RFQ error. State the board type and the end use, then ask the factory to confirm in writing which document it will inspect against.
- 04
How is IPC different from UL or ISO 13485?
UL is a safety recognition with a named file holder and production sites. ISO 13485 is a quality system scoped to medical devices. IPC acceptance documents are the rulebook for a specific lot of boards. They answer different questions and do not substitute for each other.
Where this meets the directory
These pages answer the commercial question — who can do the work and what is on record. This topic answers the technical question behind it.
Articles filed here
The four questions above are the standing brief for this topic. Dated field notes are published at the blog index as each one is finished.