Prototype Fabrication Quotes: Tooling and Speed
Prototype pricing is dominated by fixed cost — tooling, test, setup — spread over five or ten boards. That is why the tenth prototype costs a fraction of the first, and why asking for twenty instead of ten often barely changes the total.
Lead times are industry ranges, not commitments. Any factory's actual date depends on its queue that week, and on what else is already scheduled.
ChinaPCB.org does not quote boards and takes no commission. This page exists so that the enquiry you send to a factory is complete the first time. Send it yourself — see how to send an RFQ.
What this quote is priced on
Five to seven variables move the number on a prototype fab quote. They are not equally important, and only the first two are usually discussed.
- Tooling and setup. Drill program, rout program, test program and press setup are the same whether you order five boards or fifty. At prototype volume they are most of the price.
- Layer count and finish. Each added layer adds a cycle. ENIG adds a nickel-gold line that may only run on certain days, which is a lead-time cost as much as a price one.
- Electrical test. Flying probe test is priced per board and per net. It is the line most often removed to hit a date, and the one that finds the short you will spend a week on.
- Expedite. Speed is bought by displacing someone else from the queue. The premium is real and it scales with how far forward you want to move.
- Panel sharing. Some factories fill spare panel space with other customers' parts. It lowers the price and removes your control over handling and traceability.
The parameters a factory needs
This is the set that has to be in the enquiry before a prototype fab price means anything. The third column is why each one changes the answer, which is also the reason a quote that skips it is not really a quote.
| Parameter | What to state | Why it changes the answer |
|---|---|---|
| Quantity and spares | Working boards plus spares for assembly trials, stated separately | Prototype runs consume boards to debug. Without spares, a single failure stops the build. |
| Finish for the assembly process | HASL, lead-free HASL, ENIG or OSP, chosen by how the board is assembled | Hand assembly tolerates HASL; fine pitch and BGAs want ENIG. The finish decides whether the prototype can be assembled at all. |
| Electrical test requirement | Tested or visually inspected only, and the net coverage expected | Test is a fixed cost that dominates a small order. Skipping it saves a day and hides the defect that costs a week. |
| Required date | A calendar date, and whether it is the fab date or the in-hand date | Expedite is priced from the date you name. "Urgent" cannot be scheduled and is always interpreted as the cheapest interpretation. |
| Layer count and board size | Layer count, outline and whether the design may be panel-shared | Determines whether the order can ride on someone else's panel, which is the main lever on prototype price. |
| Tolerance relaxation | Which tolerances you can relax for a prototype, and which you cannot | Prototype houses often hold production tolerances at prototype prices. Saying what matters avoids paying for precision you will not measure. |
| Documentation | Gerber plus drill only, or also a fab drawing and stack-up | A fab drawing removes assumptions. Without it, the factory chooses the stack and the finish details. |
| Solder mask and legend | Colours, and whether legend is needed for hand assembly | Legend matters more on a prototype than on a production board, because a person is placing parts by reference designator. |
Send with the enquiry
- Gerbers, drill file and a fab drawing if you have one.
- Quantity plus the spares you expect to sacrifice during debug.
- The finish you will assemble onto, not the cheapest one offered.
- Whether electrical test is included, and at what coverage.
- A calendar date for boards in hand, and how much you will pay to move it.
Where it goes wrong
- Skipping electrical test to save a day. Prototypes are the boards most likely to carry a short, because the design has never been built. The saving is a day; the cost is a week of chasing.
- Ordering exactly the number you need to ship. Debug consumes boards. Without spares the build stalls waiting for a second order, which costs more than the spares would have.
- HASL on a fine-pitch assembly. The uneven surface lifts fine-pitch parts and voids joints. The board is fine and the assembly is scrap.
- Panel sharing without knowing it. Cheap prototype prices often come from riding another customer's panel. You lose control of handling, and sometimes of traceability.
Comparing two prototype fab quotes
Two prices are only comparable when the parameters above are held constant. Most of the spread buyers see comes from a difference in one of these, not from a difference in factory efficiency.
- Compare what is included: test, finish, and whether the price assumes panel sharing.
- Compare the date, not the lead time. "5 days" starting on different days is two different arrivals.
- Ask whether the quoted tolerance is production tolerance or prototype tolerance. The two are priced differently and inspect differently.
- Compare the finish. A quote that upgraded to ENIG on its own is not comparable to one that stayed on HASL.
What this page does not tell you
This page cannot tell you how fast a given factory can turn a board around, because the answer depends on the queue and on how much you are willing to pay to jump it. Any guaranteed turnaround you see advertised has conditions attached.
Related
- Prototype fabrication: what the process actually involves
- Prototype assembly quotes: the next cost step
- Rigid quotes: the production version of the same board
- RFQ checklist: what to attach to a prototype order