Stariver Circuit (Huangshi)
黄石星河电子技术有限公司(曾用名:黄石星河电路有限公司) · Huangshi · Founded 2014 · Not listed; parent Shenzhen Stariver once on NEEQ as 870735
Three headcount figures for one plant, falling from 400 to 170, against an unchanged 120,000 m2 a month. Either the count is partial or the lines are quiet.
Suits 4 to 14 layer work with thick copper, aluminium or metal-base substrate, at mid-volume, with fast sample turnaround. Does not suit a buyer who needs a current person-count and loading picture: headcount has been published three ways and is falling while stated capacity has not moved.
Identity and record
| Registered name (Chinese) | 黄石星河电子技术有限公司(曾用名:黄石星河电路有限公司) |
|---|---|
| Founded | 2014 |
| Listed | Not listed; parent Shenzhen Stariver once on NEEQ as 870735 |
| Headquarters | Huangshi |
| Production sites | Shenzhen · Longyan (Wuping) · Huangshi |
| Official website | https://www.starivergroup.cn |
| Evidence level | Public sources reviewed |
| Last reviewed | 2026-11-11 |
2014, 2016, 2017 — three years for one factory
The registry says this company was established on 20 March 2014, with RMB 100 million of capital, wholly owned by Shenzhen Stariver Circuit. The factory page says the Huangshi plant was founded in 2016. The company timeline says production began in April 2017. The development-zone file says the same: registered 2014, RMB 500 million of investment, 120 mu of land, 340-odd people at start-up.
All three years are honest. Two years between registration and first panel is normal for a greenfield PCB build, one of the slowest there is: civil works, then wastewater treatment approval, then tooling, then a qualification run.
Use 2017 when you are asking how long the process has been stable. Use 2014 when you are checking the corporate age on a vendor form. And ignore “2016”, which is a website convention rather than an event.
Three headcounts, and they do not go up
The factory page says 400 people. A 2022 government document says 340-odd at start-up. A 2025 annual-report record of insured staff says 170.
The middle figure is not a contradiction: it describes the plant on the day it opened. The other two are eight years apart and they describe a decline of more than half.
Put the last figure against the capacity claim. 120,000 m² a month divided by 170 insured employees is 705 m² per person per month. At 400 people it would be 300, and even that is high for 4 to 14 layer volume work. No multilayer plant sustains 705. Something in that pair has to give: either the insured headcount excludes agency labour and contract staff, which is likely, or the plant is not running anywhere near its stated capacity, which is also possible.
Either way, the number a buyer needs — people actually on the floor, and square metres actually processed last month — is not on any public page. Ask for both, and for the ratio between them. A supplier that cannot produce that ratio does not know its own loading.
Two group capacity totals that cannot both be true
The capability page puts group capacity at 5,000 m² a day, which is 150,000 m² a month. The factory page lists three sites: Shenzhen 25,000, Fujian Wuping 80,000 and Huangshi 120,000, which sums to 225,000 m² a month.
Fifty per cent apart. The likely explanation is that 150,000 is an older figure written before Huangshi came up, and 225,000 is the sum of three nameplate capacities, none of which is being fully used. Plausible, unconfirmed, and not the kind of thing a factory corrects quickly.
The practical reading: treat 120,000 m² a month as design capacity for Huangshi and assume nothing about actual output. Then ask what the plant shipped in the last quarter.
One more internal gap. The plant page positions Huangshi at 4 to 18 layers. The capability page caps standard production at 14 layers and advanced capability at 16. An 18-layer enquiry is therefore answered differently by two pages of the same website.
Where the heavy copper and the aluminium sit
Capability is stated plainly: 0.076 mm line and space with ±15% tolerance, 140 µm outer copper rising to 210 µm, 70 µm inner rising to 140 µm, an 8:1 aspect ratio that reaches 10:1, a 0.20 mm minimum mechanical hole, 8% impedance tolerance, and panels up to 1016 by 610 mm. Substrates run from FR-4 and halogen-free through CEM-3 and PTFE to aluminium, copper base and ceramic.
That mix is the identity of the plant. Thick copper plus metal-base substrate plus mid-volume is power electronics: LED drivers, motor control, industrial supplies, automotive lighting and charging. It is not a fine-line HDI shop and it does not claim to be.
Lead times are quoted at 3 to 5 days for samples and 10 to 12 for volume, with 2,500 part numbers a month across the group in small and mid batches. Fast samples plus a wide substrate menu is a coherent offer for industrial customers who prototype often and order in thousands rather than millions.
The rename in January 2026
On 26 January 2026 the company was approved under a new name, 黄石星河电子技术有限公司, replacing 黄石星河电路有限公司 — circuit becomes electronic technology — and the business scope was widened to integrated circuit design and to electronic component manufacturing and sales.
A name change of that kind usually precedes either a product expansion or a group restructuring. It is not evidence of either. What it does mean for a buyer is that older contracts, certificates and audit reports will carry the former name, and a due-diligence search on the new name alone will return almost nothing. Keep both strings.
Who this plant fits
Industrial and automotive power boards in the 4 to 14 layer range, thick copper, aluminium and copper-base substrates, PTFE for simple RF, mid-volume orders with frequent revisions. The prototype service is real: a 3 to 5 day sample on a 45,000 m² plant is a workable promise.
It does not fit high-layer backplanes, fine-line HDI, or a programme that needs a person-count and a loading figure before the first order. And the automotive certificates need scope confirmation: IATF 16949 appears on a page that also carries a 2011 TS 16949 entry and a 2012 military standard awarded to the Shenzhen plant, which suggests the page is a scrapbook rather than a register.
What is unresolved
No unified social credit code, no current monthly output, no certificate scope by plant, no confirmation of whether the parent is still on NEEQ. Investment is quoted as USD 53.5 million by the company and RMB 500 million by the government — roughly RMB 370 million at the rate of the day, so the two are not the same measure. Two address forms circulate: 四棵树大道 on the website and No. 88 四棵松大道 East in the registry. The high-tech enterprise certificate number GR202442004913 appears only in a wiki repost, not in an official notice.
Published limits
Every value below is quoted as published by the company or a public record.
| Parameter | Value as published |
|---|---|
| Huangshi plant profile | 45,000 m2; 120,000 m2 a month; USD 53.5M invested; 4 to 18 layers, mid to high volume |
| Layer count | 14 layers standard and volume; 16 layers as advanced capability |
| Line width and spacing | 0.076/0.076 mm; tolerance +/-15%, or +/-10% at best capability |
| Copper weight | Outer 140 um, 210 um advanced; inner 70 um, 140 um advanced |
| Aspect ratio and hole size | 8:1, 10:1 advanced; 0.20 mm minimum mechanical hole, 0.15 mm advanced |
| Substrates | FR-4, halogen-free, CEM-3, PTFE, aluminium and copper base, ceramic |
| Panel and impedance | 1016 x 610 mm maximum; impedance tolerance 8% |
| Lead time | Samples 3 to 5 days; volume 10 to 12 days |
| Group capacity | 5,000 m2 a day, or 150,000 m2 a month; 2,500 part numbers a month |
Certifications on record
A certificate covers a legal entity and a site, not a brand. Scope and expiry are recorded where published.
| Standard | What the record shows |
|---|---|
| ISO 9001:2015 and ISO 14001:2015 | Certificate images on the quality page; no plant scope and no expiry date, so coverage of the Huangshi site is unstated |
| IATF 16949:2016 | Shown on the same page with no scope or validity; which of the three plants it covers is not printed |
| UL and CQC, SR-M and SR-D | Two file marks displayed; the UL file number itself and the laminate it covers are not published |
| TS 16949 (2011), GJB 9001B (2012) | Historic entries from the company timeline; the military standard was awarded to the Shenzhen plant |
Ask this factory for a quote
Send one technical package and compare the replies. The RFQ checklist lists what to include; the quote specifications say which parameters change the price for the process you are buying.
Source and review conventions are described in how we verify. Corrections can be sent through the contact channel.