Box-Build Quotes: Mechanical Content and Test
Box build is an assembly of assemblies. The price is dominated by mechanical parts, cable harnesses and functional test, not by the PCB content. It is also the quote most often built on drawings that are not yet released, which is why box build projects slip more than board projects.
Lead times are industry ranges, not commitments. Any factory's actual date depends on its queue that week, and on what else is already scheduled.
ChinaPCB.org does not quote boards and takes no commission. This page exists so that the enquiry you send to a factory is complete the first time. Send it yourself — see how to send an RFQ.
What this quote is priced on
Five to seven variables move the number on a box build quote. They are not equally important, and only the first two are usually discussed.
- Enclosure and mechanical parts. Tooling, finish and tolerance are all in the mechanical package. A custom enclosure can exceed the electronics cost and set the whole schedule.
- Harness and cabling. Harness work is largely manual. Crimping, routing and testing are labour, and the labour scales with the number of conductors, not with the product price.
- Functional test. Someone has to write the test, build the fixture and run it. If the factory writes it, that is engineering time priced as a service.
- Configuration control. Firmware version, serialisation and labelling are process steps. Getting them wrong produces units that cannot be traced or updated.
- Packaging and logistics. Drop protection, ESD packaging and labelling are specified parts. They are small per unit and significant per shipment.
The parameters a factory needs
This is the set that has to be in the enquiry before a box build price means anything. The third column is why each one changes the answer, which is also the reason a quote that skips it is not really a quote.
| Parameter | What to state | Why it changes the answer |
|---|---|---|
| Assembly drawing revision | The drawing number and revision the quote is against, and its release status | Box build quotes against unreleased drawings are placeholders. Naming the revision makes the number bound to something. |
| Enclosure source and tooling | Who supplies the enclosure, who owns the tool, and the lead time | Mechanical lead time usually sets the project date. Tool ownership decides whether you can move supplier later. |
| Harness drawings | Harness drawing with connector part numbers, lengths and routing | Harness labour is priced from the drawing. A verbal description produces a guess that is wrong by a large factor. |
| Functional test ownership | Who writes the test procedure, who builds the fixture, and what is tested | Test development is engineering time. Assuming it is included is the most common gap in a box build quote. |
| Firmware and configuration | Who programs, which version, and how serial numbers and labels are controlled | Configuration steps are process steps. Without them in the quote, units ship unprogrammed or mislabelled. |
| Packaging and labelling | Packaging specification, ESD requirement and label content and placement | Specified packaging is a purchased item and a labour step. Left open, it becomes the cheapest interpretation. |
| Environmental and safety test | Drop, vibration, hipot or burn-in requirements, and the standard | These are separate fixtures and separate time. A quote without them covers a unit that has not been qualified. |
| Service and spares policy | Spares quantity, repair responsibility, and warranty terms | Warranty and repair commitments are cost lines, not contract decoration, and they belong in the quote. |
Send with the enquiry
- The assembly drawing with revision level, and its release date.
- Enclosure source and tooling ownership, plus the mechanical lead time.
- Harness drawings with connector part numbers and lengths.
- Whether the factory writes the functional test, and what it must cover.
- Packaging, labelling and any environmental test the unit must pass.
Where it goes wrong
- Quoting against an unreleased drawing. The number is a placeholder. It moves once the mechanics are fixed, and the movement is usually upward and late.
- Test procedure assumed. Nobody wrote it. The factory either builds a minimal power-on check or stops and asks, and the schedule absorbs the delay.
- Enclosure lead time not on the critical path. The electronics finish first and the project still waits. Box build schedules are set by the slowest mechanical part.
- Firmware and labelling left to the line. Units ship with the wrong version or without traceability, and the fix is a recall rather than a rework.
Comparing two box build quotes
Two prices are only comparable when the parameters above are held constant. Most of the spread buyers see comes from a difference in one of these, not from a difference in factory efficiency.
- Compare what test scope is included. Functional test is the line that most changes a box build price.
- Compare the drawing revision both quotes were built against. Different revisions are different products.
- Compare enclosure ownership and lead time. A cheaper build with a longer mechanical lead time is a later delivery.
- Compare packaging and labelling. They are small numbers per unit and large numbers per order.
What this page does not tell you
This page says nothing about certification. A box build quote does not imply the unit will pass CE, UL or FCC, and test for those marks is a separate programme with its own cost and its own failures.
Related
- Box build: what the process covers and what it does not
- Turn-key quotes: the electronics half of the same job
- Assembly quotes: the board that goes inside
- EMS and contract manufacturing: the wider relationship
Fee structure and editorial independence are described on the about page. What we can and cannot confirm about a factory is on how we verify.