Huizhou Glorysky Electronics
惠州市特创电子科技股份有限公司 · Huizhou, Guangdong · Founded 2010 · Not listed
Glorysky's process table runs three year columns: 32 layers now, 36 in 2027 and 78 in 2028. Directories quote the last column as if it were today.
A Huidong multilayer and metal-substrate plant at 2.4 million m2 a year, strongest on heavy copper and automotive boards. Suits 4 to 32 layer industrial work now. Do not design to the 78-layer, 40:1, 0.040 mm column: those are 2028 targets with no build evidence published.
Identity and record
| Registered name (Chinese) | 惠州市特创电子科技股份有限公司 |
|---|---|
| Registered name (English) | Huizhou Glorysky Electronics Co., Ltd. |
| Founded | 2010 |
| Listed | Not listed |
| Headquarters | Huizhou, Guangdong |
| Production sites | Huizhou (Huidong) · Huai'an · Malaysia |
| Official website | http://www.glorysky.com.cn |
| Evidence level | Public sources reviewed |
| Last reviewed | 2026-11-11 |
The table has three columns and you are standing in the first
Glorysky publishes a process capability table unlike anyone else’s in this directory. Instead of one set of maximums, it has three column groups headed 2026, 2027 and 2028. Read across a row and you get a plan.
Layers: 32, then 36, then 78. Minimum line and space: 0.050 mm, 0.045 mm, 0.040 mm. Aspect ratio: 20:1, 25:1, 40:1. Finished copper: 6 oz, 8 oz, 9 oz. Maximum thickness: 4.5 mm, 5.0 mm, 8.0 mm. Panel size: 1200 × 610 mm, then 1500 × 610 mm twice. Impedance tolerance: ±8%, ±8%, ±5%.
Nothing in the table says “roadmap”. The columns say the year. That is enough — and it is more honest than most capability pages, which present a single aspirational maximum as if it were a shipping specification.
The problem is downstream. Every supplier directory and every sourcing article that quotes this company quotes 78 layers, 40:1 and 0.040 mm, because those are the biggest numbers on the page. Those are 2028 values. A buyer who benchmarks against them in 2026 is benchmarking against a construction schedule.
What the 2026 column actually commits to
Take the first column on its own and you have a solid mid-tier multilayer plant: 32 layers, 0.050/0.050 mm, 20:1, 6 oz finished copper, 4.5 mm maximum thickness, 1200 × 610 mm panels, impedance held to ±8%, mechanical drilling down to 0.15 mm with laser drilling at 0.050 mm.
Those are respectable numbers, and they line up with everything else on the record. The city government report puts existing capacity at 2.4 million m² a year and lists the product mix as single-sided, aluminium-based, double-sided, multilayer and high-frequency high-speed boards. A plant doing 2.4 million m² with single-sided and aluminium in the mix is not a 78-layer shop. It is a volume plant with a heavy-copper speciality.
Same document gives the speciality plainly: thick-copper capability described as leading within China, and strength in optoelectronic boards, inverters, AC-DC converters and charging piles.
The jump from 36 to 78 is not a process step
Between 36 layers and 78 layers there is nothing in the table — no intermediate year, no qualification milestone, no statement about presses, lamination cycles or registration accuracy. A 78-layer board at 40:1 is a different manufacturing problem, not a bigger version of a 36-layer one. Depth-to-diameter at 40:1 strains drilling and plating. Seventy-eight layers strains lamination count, layer-to-layer registration and press tonnage.
A published target is not a qualified build. No order, no first-article report, no customer and no acceptance document is named for the 2028 column, and the same is true of 9 oz copper and ±5% impedance.
This is the single most useful thing to know about this page: the company is telling you where it intends to be, and it is telling you when. Use that. But write your specification against the column dated today, and ask what evidence exists for the next one before you design a product that needs it.
Where the other numbers disagree
Annual capacity is 2.4 million m² in the government report and 2.5 million m² in a registry digest, the second probably including Huai’an or capacity still being built.
Headcount is 1,687 in the 2022 annual report quoted by the digest, against 849 in a 2023 encyclopaedia entry. The gap is too large to be attrition; the two are counting different perimeters, probably all sites against one.
The site list has also moved. A 2023 entry described Huidong, Huai’an and Anqing under construction. The current site describes Huidong, Huai’an and Malaysia, with Anqing gone and no announcement. A factory that appears in one year’s site list and not the next is worth asking about directly, because it changes where your order is built.
Certificates sorted by plant, not by scope
The certification page is laid out in two columns, Huidong and Huai’an, as image blocks. Across them: ISO 9001:2015, IATF 16949:2016, ISO 13485:2016, ISO 45001:2018, ISO 14001:2015, IECQ QC080000:2017, ISO 27001:2022, ISO 50001:2018, plus ISO 14064 and 14067 verification statements for carbon.
That is a broad and credible list for a plant of this size — the medical device standard in particular is unusual in this segment. But the layout defeats verification. ISO 13485 appears once, in a column position that does not resolve cleanly at the resolution published, so whether medical work can be quoted from Huidong or only from Huai’an is unknown. No entry carries a number, an issuing body or an expiry date.
Where this factory fits
Good fit: 4 to 32 layer industrial and automotive boards, heavy copper for power conversion, aluminium and metal-core substrates, high-frequency material, and medical work if the ISO 13485 scope is confirmed for the plant quoting. Automotive coverage is broad on paper — motor and controller, battery modules, smart cockpit, lighting, driver assistance, radar — and the company says it supplies several named Tier 1 brands, without naming them.
Poor fit: backplanes above 40 layers today, 0.040 mm line work today, any-layer HDI, and any programme where the supplier’s maximum layer count has to be contractually warranted rather than stated as a plan. Also a poor fit if your qualification requires certificate numbers before the first meeting.
What is not established
No unified social credit code in a first-party document. No employee count that two sources agree on. No certificate numbers, scopes or expiry dates. The listing history — a 2022 ChiNext filing, an April 2023 rejection at first review, a 2024 relaunch and an April 2026 termination of tutoring — comes from an encyclopaedia entry and was not checked against exchange filings. And no evidence of production at 78 layers, 40:1, 9 oz copper or ±5% impedance.
Published limits
Every value below is quoted as published by the company or a public record.
| Parameter | Value as published |
|---|---|
| Layer count by year column | 32 layers in 2026, 36 in 2027, 78 in 2028 |
| Maximum panel size | 1200 x 610 mm in 2026; 1500 x 610 mm in 2027 and 2028 |
| Board thickness | Maximum 4.5 / 5.0 / 8.0 mm by year; minimum 0.3 mm; minimum core 0.05 mm |
| Finished copper weight | 6 oz in 2026, 8 oz in 2027, 9 oz in 2028 |
| Minimum line and space | 0.050 mm in 2026, 0.045 mm in 2027, 0.040 mm in 2028 |
| Drilling | Mechanical drill 0.15 mm down to 0.10 mm; laser drill 0.050 mm |
| Maximum aspect ratio | 20:1 in 2026, 25:1 in 2027, 40:1 in 2028 |
| Impedance tolerance | Plus or minus 8 percent in 2026 and 2027, plus or minus 5 percent in 2028 |
| Annual capacity, existing plants | 2.4 million m2 a year, per a Huizhou municipal government report |
Certifications on record
A certificate covers a legal entity and a site, not a brand. Scope and expiry are recorded where published.
| Standard | What the record shows |
|---|---|
| ISO 9001:2015 | Certification page runs two image columns, Huidong and Huai'an; blocks cannot be tied to a specific plant |
| IATF 16949:2016 | Shown in the same two-column layout; no certificate number, issuing body or expiry date |
| ISO 13485:2016 | Medical device quality system, appears once in the columns; which plant holds it is not stated |
| ISO 45001:2018 / ISO 14001:2015 | Occupational health and environment, split across the two plant columns, no numbers |
| IECQ QC080000:2017 | Hazardous-substance process management, shown in the column layout without a certificate reference |
| ISO 27001:2022 / ISO 50001:2018 | Information security and energy management; the page also lists ISO 14064 and 14067 verification statements |
Ask this factory for a quote
Send one technical package and compare the replies. The RFQ checklist lists what to include; the quote specifications say which parameters change the price for the process you are buying.
Source and review conventions are described in how we verify. Corrections can be sent through the contact channel.