Factory profile · Public sources reviewed

Sanlicheng Technology (Yiyang)

湖南三立诚科技有限公司 · Founded 2021 · Not listed (wholly owned by Huizhou Sanlicheng Technology)

Sanlicheng moved its production from Huizhou to Yiyang, but 700,000 m2 a month is a website plan; a 2025 government note records four lines at 100,000.

Suits aluminium and metal-core LED and display boards, long panels up to 1500x600 mm, built in Yiyang. Does not suit anyone quoting the 700,000 m2 a month plan as capacity: a 2025 provincial note records four lines at 100,000 m2 a month, and the certificates are parent-level with no Yiyang scope. Ask for the site on the certificate.

Identity and record

Only entries that were checked against a source are shown. A blank field means we have not confirmed it, not that it does not exist.
Registered name (Chinese) 湖南三立诚科技有限公司
Founded 2021
Listed Not listed (wholly owned by Huizhou Sanlicheng Technology)
Production sites Huizhou · Yiyang
Unified social credit code 91430903MA4TCLG991
Official website http://www.slcpcb.com
Evidence levelPublic sources reviewed
Last reviewed2026-11-11
Registered entity and published production sites Registered entity Sanlicheng Technology (Yiyang) and 2 named production sites, from the disclosures cited on this page. PUBLISHED RECORD Sanlicheng Technology (Yiyang) 湖南三立诚科技有限公司 Founded 2021 · Not listed (wholly owned by Huizhou Sanlic… Huizhou Site 1 Yiyang Site 2 Source: disclosures cited on this page
Entity and footprint map. Sanlicheng Technology (Yiyang) and the production sites named in the disclosures cited above.

The factory moved; the certificates did not obviously follow

Huizhou Sanlicheng ran in a rented 20,000 m2 building before it rebuilt itself inland in Yiyang. The parent, 惠州市三立诚科技有限公司, was founded in 2013; the Hunan entity, 湖南三立诚科技有限公司, was registered on 20 May 2021 with unified social credit code 91430903MA4TCLG991 and capital that rose from RMB 80 million to RMB 130 million in July 2025. The company describes the move as a relocation plus a new build, because the leased Huizhou floor could no longer hold the volume.

So a purchase order placed today is built in Yiyang at No. 3 Hongyuan Road in the Changchun Economic Development Zone, not in Huizhou. The qualification paperwork is less certain. The website and the opening article say ISO 9001, IATF 16949 and ISO 14001 are passed and that UL and cUL product approvals are held, and a national high-tech enterprise award from 2020 sits in the Huizhou parent’s name. None of these states that the Yiyang factory is inside the certificate scope. For an automotive buyer that is the question to put first.

Seven hundred thousand planned, one hundred thousand running

The company profile announces a Hunan capacity of 700,000 m2 a month: 200,000 of common board, 400,000 of LED Mini board and 100,000 of double-sided and multilayer, on RMB 500 million of investment and 8.4 million m2 a year. A January 2025 note from the Hunan provincial industry bureau describes the same plant as four production lines at 100,000 m2 a month. The plan is seven times the running figure.

Seven times is the largest plan-to-actual gap in this Yiyang set. It is not a fraud; it is a master-plan number left on an unedited page while the lines were still being commissioned. The same profile still says Phase I was planned to start in May 2023, a line that the December 2023 opening and the 2024 production start superseded. Read the government note for the present, the website for the ambition, and do not quote the latter as available capacity.

Three opening dates for one plant

Three dates are printed. The website says Phase I was to start in May 2023. The People’s Daily party-media platform records trial production in August 2023, RMB 40 million of output value across October to December, and an opening ceremony on 26 December 2023. The provincial industry bureau and a Ziyang district note simply say production began in 2024. All three are on the record.

The 83 mu site holds 100,000 m2 of standard factory space and RMB 500 million of investment, with three 150-metre lines mentioned in the opening coverage. The dates are not a contradiction to resolve; they describe a plan, a trial, a ceremony and a formal production year. A buyer asking when the plant started should expect whichever of the four the respondent is holding.

Two output values for 2024

Ziyang district published two figures for 2024. A 14th five-year plan article puts the year at RMB 230 million with a 2025 target of RMB 400 million. A separate early-2025 restart article says RMB 330 million for 2024 with a 2025 target of RMB 600 million, about 300,000 m2 of aluminium board and 450-plus workers. Both are government pages and both are reproduced here without choosing.

The 300,000 m2 of aluminium board carries its own caveat: the source does not say whether that is a month or a year. If it is annual it is about 25,000 m2 a month and does not conflict with the 100,000 m2 a month total, but there is no way to check. Staff likewise sit at 450-plus in the visit note and 424 insured in the 2025 filing, a small gap that no source explains.

Huizhou still exists as the parent

The plant list has two cities, Huizhou and Yiyang, but they are not two fabs of equal weight. The Huizhou company, founded in 2013 with RMB 130 million of capital and 650 staff, is the 100% owner and built its own industrial park in 2022; the Hunan company is the manufacturing subject, wholly owned, with legal representative Fang Shaoping and 424 insured staff in 2025. The brand and the legal person belong to one system, so a quotation may arrive on Huizhou letterhead for a board built in Yiyang.

That is the other plant in the group, and it matters for the purchase order. Put the build site on it and ask which entity issues the invoice. The group name alone does not tell you where the panel passed through the etcher.

Where the metal-core work belongs

The technical page is the most concrete part of the record. Substrates are aluminium, FR4, CEM3 and CEM1, copper and iron base, with HASL, lead-free HASL, OSP and immersion gold finishes. Maximum product size is 1500x600 mm, board thickness 0.4-8 mm, copper 0.5-4 oz, thermal conductivity 1-6 W/mK, minimum trace and gap 0.1 mm, minimum hole pitch 0.3 mm and minimum PAD 100 um at +/-10 um. LED Mini COB work goes down to a 0.05 mm trace, a 0.10x0.25 mm pad, 0.08 mm pad pitch and a 0.075 mm solder-mask bridge on 0.3-0.4 mm board.

The company says it holds about a third of the LED display board niche for thermally conductive metal substrate, with roughly 10 um precision, but that is a government article quoting the company, not a third-party measurement. Customers named in the opening coverage are Huawei, Xiaomi and Hisense.

Fit and the gaps in the file

This supplier suits aluminium and metal-core LED and display boards, long panels up to 1500x600 mm, and buyers who can verify a plant that only opened at the end of 2023. It does not suit anyone who needs a certificate that explicitly names the Yiyang address, or who will treat 700,000 m2 a month as capacity. Ask for the current ISO 9001, IATF 16949 and UL documents with their scope and site address.

No certificate numbers, no Yiyang-specific certificate scope, no confirmed 2025 output and no unit for the 300,000 m2 aluminium figure are public. The 700,000 plan and the 100,000 running figure, the two 2024 output values and the three opening dates will keep appearing in both forms; this page keeps each pair rather than selecting one.

Published limits

Every value below is quoted as published by the company or a public record.

ParameterValue as published
Substrate range Single/double/multilayer; aluminium, FR4, CEM3/CEM1, copper and iron base; HASL, lead-free HASL, OSP, ENIG
Panel size and thickness Max product size 1500x600 mm; board 0.4-8 mm; copper 0.5-4 oz
Trace and hole geometry Min trace 0.1 mm, min gap 0.1 mm, min hole pitch 0.3 mm; min PAD 100 um, PAD tolerance +/-10 um
Thermal capability 1-6 W/mK; min DAM 75 um; CNC outline +/-3 mil, punching +/-4 mil
LED Mini COB capability Min trace 0.05 mm, pad 0.10x0.25 mm, pad pitch 0.08 mm, solder-mask bridge 0.075 mm, board 0.3-0.4 mm
Announced Hunan capacity plan Common 200,000 + LED Mini 400,000 + double/multilayer 100,000 = 700,000 m2/month; RMB 500m; 8.4m m2/a
Actual capacity in 2025 4 production lines, 100,000 m2/month (Hunan industry bureau, January 2025)
2024 output value and headcount About 300,000 m2 of aluminium board, 2024 output value RMB 330 million, 450+ workers
Plant footprint 83 mu, 100,000 m2 standard factory, RMB 500 million total; opened 2023-12-26
One published plan, one running figure Bar chart of 2 published figures in square metres per month, for the Yiyang plant. The company profile announces 700,000 m2 a month; a January 2025 Hunan industry bureau note records four lines at 100,000. The larger figure is a master-plan target, not capacity available today. Website plan 700,000 m2 announced Hunan master plan, seven times the other Gov note 2025 100,000 m2 four production lines reported by the bureau
One published plan, one running figure. square metres per month, for the Yiyang plant. The company profile announces 700,000 m2 a month; a January 2025 Hunan industry bureau note records four lines at 100,000. The larger figure is a master-plan target, not capacity available today. Source: company profile and January 2025 Hunan industry bureau note.

Certifications on record

A certificate covers a legal entity and a site, not a brand. Scope and expiry are recorded where published.

StandardWhat the record shows
ISO 9001 / IATF 16949 / ISO 14001 Website and opening article say passed; no numbers, body, expiry, and no split of Huizhou versus Yiyang coverage
UL & cUL Website claims UL and cUL product safety approval; certificate number and applicable plant not published
High-tech / specialised SME (parent) Awarded 2020 in the Huizhou parent's name, not a standalone Hunan qualification; Hunan number and expiry not published

Ask this factory for a quote

Send one technical package and compare the replies. The RFQ checklist lists what to include; the quote specifications say which parameters change the price for the process you are buying.

Request a quote

Source and review conventions are described in how we verify. Corrections can be sent through the contact channel.